01
Site visit & consultation

We survey the plot, discuss budget and requirements, and confirm feasibility before any drawing begins.

Week 1
02
Design & approval

Floor plans and elevations are drafted, revised with you, and submitted for local building approval.

Weeks 2–5
03
Foundation & structure

Excavation, footing, and the RCC frame go up, inspected by our structural engineer at every pour.

Weeks 6–14
04
Masonry & roofing

Brickwork, plastering, and roof slabs are completed, with weekly photo updates sent to you.

Weeks 15–22
05
Finishing

Flooring, electrical, plumbing, painting, and fittings are installed and tested room by room.

Weeks 23–30
06
Handover

A final walkthrough with you, snag-list corrections, and documentation handed over along with the keys.

Week 31